Classifications
EXCLUDED ITEMS
Asbestos
Material not accepted. JGI do not permit any asbestos onsite. Loads containing potential asbestos will be immediately quarantined and investigated. The client shall be liable for all quarantine and investigation costs and should asbestos be identified the client shall be liable for all remediation costs including hygienist reports.
Friable Material
Material not accepted. JGI do not permit any friable material such as gyprock, fibro sheeting, hardiplank, bonded cement pipes etc. Will be subject to current reload fee. If not reloaded within 24 hours will be disposed of offsite at a charge of $360/t.
Loads with Rubbish greater than 2%
Material not accepted. Will be subject to current reload fee. If not reloaded within 24 hours will be disposed of offsite at a charge of $360/t.
Fill or Topsoil with organics greater than 30%
Material not accepted. Will be subject to current reload fee. If not reloaded within 24 hours will be disposed of offsite at a charge of $360/t.
Mixed Loads
Material not accepted. Fill or Topsoil loads containing any concrete, bricks, or asphalt. Concrete/Brick Asphalt loads containing any organics or timber.
Will be subject to current reload fee. If not reloaded within 24 hours will be disposed of offsite at a charge of $360/t.
EARTHWORKS CATEGORY
*No Concrete, Bricks or Asphalt accepted in Fills*
PLEASE NOTE:
All Earthen materials not supported by a soil report will be treated as PASS and charged at $24.20/t.
Material will be tested onsite and if Ph is <4, material will be classified as AASS and disposed of at a landfill and charged at $360/t
Fill
Clean VENM (Virgin Excavated Natural Material).
Topsoil
Topsoil with less than 10% organics, clay or silt.
Organic
Fill or Topsoil containing 10% – 30% organics per load.
Organics to be no greater than sieve bucket sizing.
Potential Acid Sulfate Soil (PASS)
Soils with a PhFox<3.
Actual Acid Sulfate Soil (AASS)
Oxidized soil with a Ph<4.
JGI only accept AASS by prior agreement and with written approval.
Green Waste
Green Waste material free from dirt, soil, concrete, bricks and asphalt
Waste Surcharge
Any material classification containing non-putrescible rubbish up to a maximum of 2% visually, (i.e. 200cm2 per 1m2) shall have the surcharge$22.00/T applied as an extra over charge. Loads containing greater than 2% not accepted and will be subject to a reload fee.
RECYCLING CATEGORY
*No Organic Material Accepted in Recycled*
Concrete
Concrete including any combination of dirt, bricks, asphalt sand & reo less than 20%
Dirty Concrete
Concrete including any combination of dirt, bricks, asphalt sand & reo greater than 20% less than 50%
Dirt & Concrete
Concrete including any combination of dirt, bricks, asphalt sand & reo greater than 50%
Brick
Brick including any combination of dirt, concrete, asphalt, sand & reo less than 20%
Dirty Brick
Brick including any combination of dirt, concrete, asphalt, sand & reo greater than 20% less than 50%
Dirt & Brick
Brick including any combination of dirt, concrete, asphalt, sand & reo greater than 50%
Asphalt Profiling
Profiled asphalt less than 50mm
Asphalt
Asphalt including any combination of dirt, concrete, brick, sand & reo less than 20%
Dirty Asphalt
Asphalt including any combination of dirt, concrete, brick, sand & reo greater than 20% less than 50%
Dirt & Asphalt
Asphalt including any combination of dirt, concrete, brick, sand & reo greater than 50%
Clean Sand
Dry Sand free of any organics and foreign material
Dirty Sand
Sand with less than 20% of any combination of concrete, brick, asphalt, rock, clay or silt.
Clean & Sized Rock
Clean & sized rock (100mm – 300mm & 300mm – 600mm).
Clean Rock
Rock unsized (0 – 600mm) containing less than 20% earthen material
Dirty Rock
Rock unsized containing more than 20% earthen material
Waste Surcharge
Any material classification containing non-putrescible rubbish up to a maximum of 2% visually, (i.e. 200cm2 per 1m2) shall have the surcharge$22.00/T applied as an extra over charge. Loads containing greater than 2% not accepted and will be subject to a reload fee.